Equipment Installation
Client Project WorkSummary Weight(ton) Duration
Electricity Generating Authority of Thailand Krabi Power Erection of FGD absorber, duct work, and related equipments for 350 MW boiler 3300 20/4/01 31/1/02
The Bangchak Petroleum Public Company Ltd. Modify SCTU#1900 Repair / fab & erect vessel/colmns and pipe for waste treatment unit 26/2/01 16/2/02
Alstom Power Australia Bowin Power Fabricate and erect HRSG stack x 2 units for 700 MW CC. 260 15/1/01 29/6/01
Alstom Power Thailand Bang Bo Power Fabricate and install embedment parts for ST/GT26 x 1 unit for 350 MW CC. 102 15/12/00 10/4/01
Alstom Power Thailand Bowin Power Fabricate and install embedment parts for ST/GT26 x 2 units for 713 MW CC 26/7/00 5/11/00
J.V. EGCO/ITE Co.,Ltd. Ratchaburi Combined Cycle Erection HRSG x 2 units and interconnected piping for combined cycle 600 MW 5102 1/2/99 31/8/99
ABB Sadelmi SpA Mae Moh FGD unit 4-7 Fab and erect FGD duct and support for Lignite fired boiler 150 MW x 4 units 1468 16/10/98 18/10/99
Kumagai Gumi Co.,Ltd. COCO Phase III Erection coaling handling and structure for coal fired boiler 815 19/7/98 2/12/98
Siam Cement Public Co., Ltd. Tungsong 6 Erect dome for limestone circular storage in cement plant 20/10/97 18/6/98
Siam Cement Company Tungsong 6 Erect stacker and reclaimer total 6 units for cement plant 1049 15/10/97 15/5/98
Power-P Public Company Bangkok Cogen. Erection mechanical equipments for 112 MW cogeneration plant (HRSG, CT, ST and B 1940 13/9/97 30/4/98
Siam Cement Company Kang Koi 2 Erect stacker and reclaimer for cement plant 158 15/11/96 15/1/97
Siam Guardian Co., Ltd. Capping line installation Erect equipments of capping line for glass manufacturing process 15/10/96 15/2/97
Siam Cement Company Kang Koi 1 and 2 Erect stacker and reclaimer for cement plant 20/8/96 18/11/97
LG Engineering Co., Ltd. TPI Lube Base Oil Install 135,00 dia-inch of piping work and equipments for lube base oil plant 15/3/96 15/10/96
Siam Cement Company Lampang Erect stacker and reclaimer total 6 units for cement plant 1172 15/10/95 15/3/96
Sumsung Heavy Industires Co.,Ltd. TPI Ethylene Project Erect 110 tph oil/gas fired boiler x 2 and 35 MW steam turbine in Ethylene Plant 15/10/95 30/9/96
Siam Cement Company Tungsong 5 Erect stacker and reclaimer total 6 units for cement plant 1172 15/9/95 15/4/96
Asia Cement Co., Ltd. Asia Cement 2 Fab. and erect raw mill, ESP, clinker cooler, conveyor, silo 7553 15/1/95 15/3/96
Kvaerner ABB Consortium Bhumibol Hydro Power Project Install unit 8 spiral draft tubes and associated equipment 4/7/94 31/12/95
Next 1 2


Registered Office :
215/148-149 Pracharad 1Rd.,
Kwang Bangsue,Khet Bangsue,
Bangkok 10800 Thailand
Tel.: +66 (0)2 585 2556 to 8
Fax : +66 (0) 2 587 6068
VIPCO 2 Main Workshop :
42, 52 Moo 7, Koo-Bang-Luang,
Ladlumkaew, Pathumthani
12140 Thailand
Tel.: +66 (0) 2 979 4001 to 8
Fax : +66 (0) 2 979 4010
VIPCO 1 Workshop :
28/2 Moo 4, Bangkok-Pathumthani Rd.,
Bang Ka-yang,Muang Pathumthani
Pathumthani 12000 Thailand
Tel.: +66 (0) 2 975 2811 to 4
Fax : +66 (0) 2 975 2815
VIPCO 4 Fin Shop :
220-220/1 Moo 3,Toong Sukhla,
Sriracha District, Chonburi
20230 Thailand
Tel.: +66 (0) 38 401 207,494 059-60
Fax : +66 (0) 38 401 206
VIPCO 5 Workshop :
559/9 Moo. 1 Nong Kham
Sriracha District, Chonburi
20110 Thailand
Tel.: +66 (0) 38 110 711-18
 
VIPCO 6 Workshop:
Laem Chabang Port, (near
CO Seaport), Toong Sukhla,
Sriracha District,
Chonburi, Thailand