Not only do the installations of static and pressure part equipments like conventional power boilers and heat recovery steam generators conforms to ASME Section I and ANSI B31.3, but VIPCO can also handle installation works of major rotating machineries like gas turbines and steam turbines.

  
  

         In 1995, VIPCO executed three major cement plant installation projects simultaneously with a total manpower of more than 1,200 workers. All projects were completed on time.

  
  

        From successful in installing FGD ducts for 150 MW × 4 lignite fired boiler, in year 2002 VIPCO finished the entire FGD system for the 350 MW Power Plant. This project include FGD absorber prefabricated from C-276 cladded plate, GGH which required Hastelloy lining, and flake lining ducts, as well as material handling system and mill.

    


Registered Office :
215/148-149 Pracharad 1Rd.,
Kwang Bangsue,Khet Bangsue,
Bangkok 10800 Thailand
Tel.: +66 (0)2 585 2556 to 8
Fax : +66 (0) 2 587 6068
VIPCO 2 Main Workshop :
42, 52 Moo 7, Koo-Bang-Luang,
Ladlumkaew, Pathumthani
12140 Thailand
Tel.: +66 (0) 2 979 4001 to 8
Fax : +66 (0) 2 979 4010
VIPCO 1 Workshop :
28/2 Moo 4, Bangkok-Pathumthani Rd.,
Bang Ka-yang,Muang Pathumthani
Pathumthani 12000 Thailand
Tel.: +66 (0) 2 975 2811 to 4
Fax : +66 (0) 2 975 2815
VIPCO 4 Fin Shop :
220-220/1 Moo 3,Toong Sukhla,
Sriracha District, Chonburi
20230 Thailand
Tel.: +66 (0) 38 401 207,494 059-60
Fax : +66 (0) 38 401 206
VIPCO 5 Workshop :
559/9 Moo. 1 Nong Kham
Sriracha District, Chonburi
20110 Thailand
Tel.: +66 (0) 38 110 711-18
 
VIPCO 6 Workshop:
Laem Chabang Port, (near
CO Seaport), Toong Sukhla,
Sriracha District,
Chonburi, Thailand